One of the most common questions we get before booking is: "What exactly happens on install day?" People want to know how much of their day to block off, whether they need to be home, what the crew will be doing, and what the finished result will look like.
Here's the complete walkthrough — from when our truck pulls up to when you're controlling your lights from your phone for the first time.
Before install day: what we do to prepare
Once you've accepted your quote, our team creates a detailed installation plan for your specific home. We note the exact roofline measurements, the mounting approach for your fascia type, the wire routing path, and where the controller box will be located. When our crew shows up on install day, there's no figuring things out — they have a plan.
We'll confirm your install date and give you a 2-hour arrival window the day before. Most Calgary installs happen between 8am and 4pm.
The installation process, step by step
Arrival and site walkthrough (15–20 min)
Our crew introduces themselves, confirms the plan with you, and does a final visual check of the roofline. This is when we note any last-minute adjustments — an obstacle we hadn't seen in photos, a fascia section that needs a different mounting approach, etc. We confirm where the controller box will go and where wiring will run.
You need to be home for this stepChannel cutting and preparation (30–60 min)
Our custom aluminium channels are cut to the exact length required for each section of your roofline. Channels are mitre-cut at corners so they meet cleanly at angles. End caps are fitted. This is all done on-site with our own equipment — we don't use pre-cut generic lengths.
You don't need to be presentChannel mounting along the roofline (1–3 hours)
This is the core of the install. Channels are mounted to your fascia using weatherproof stainless steel screws at precisely measured intervals. Our team uses laser levels to ensure perfectly straight runs. Corners are handled with custom-angle fittings — no gaps, no exposed seams. For two-storey homes, we use commercial-grade ladders and scaffolding as needed.
You don't need to be presentLED puck installation and connection (30–60 min)
Our Gen 2 LED pucks are seated into each channel at 8-inch spacing and connected at junction points. Connections are made with weatherproof clip connectors — no soldering required on-site, which eliminates the risk of poor solder joints failing in Calgary's freeze-thaw cycles.
You don't need to be presentWiring routing and concealment (30–60 min)
All power wiring is routed from the roofline down to the controller box. We use your existing fascia and soffit pathways wherever possible to minimize visible wire runs. Where wiring must be visible, we use colour-matched conduit that blends with your home's exterior. No bare wires, no exposed cable staples.
You don't need to be presentController installation and electrical connection (30 min)
The Starise controller box is mounted in your garage, mechanical room, or utility space — wherever is most accessible and protected from weather. It's hard-wired to a dedicated circuit (we handle this with a licensed electrician on our team). The controller manages all zones and communicates with the app via Wi-Fi.
You don't need to be presentSystem test and quality check (20–30 min)
Before the final walkthrough, we run every zone through a full colour cycle to confirm every LED is working, every connection is solid, and every channel section is evenly lit. We check for any dark spots, inconsistent brightness, or alignment issues and correct them on the spot.
You don't need to be presentApp setup and owner walkthrough (20–30 min)
This is the fun part. We download the Starise app on your phone (or tablet), connect it to your controller, and walk you through everything: picking colours, choosing animated patterns, setting schedules, and using the presets (Canada Day, Christmas, Halloween, etc.). We don't leave until you're comfortable with the system.
You need to be home for this stepWhat your home looks like after install
When we leave, your roofline will have clean aluminium channels running its full length, with no visible wiring on the exterior. The lights will be off (or in whatever setting you chose during the walkthrough). From the street, the channels are subtle and architectural-looking — they don't draw attention when off, and they look spectacular when on.
We clean up completely before leaving. No packaging, no cut scraps, no mess. Most homeowners say the install looks cleaner than they expected.
What to do before install day
- Clear vehicle access to the side of your home (we need to park close to the roofline work area)
- Ensure your Wi-Fi router is working — we'll need to connect the controller during setup
- Have your phone charged and ready for the app walkthrough
- Note any specific areas or sections you want prioritized (e.g. the front roofline only, or the garage as well)
Frequently asked questions
Ready to book your Calgary installation?
Most installs are booked 1–3 weeks out. Get your quote now and we'll lock in your date.
Get a Free Quote →